Basement Finish in St. Louis Park
Posted: May 6th, 2009 | Author: Terry Owens | Filed under: Uncategorized | 1 Comment »This was my first project on my own that was the start of Como Lake Carpentry. The Lundeens are a fantastic couple that live in St. Louis Park, and back in August Max asked me to do some of the work to finish their basement. So it started off as block walls and cement floor, and the end result is much more inviting. I took care of the framing, insulating, sheetrock, mudding and taping, and trimming. You can check it out at Angie’s blog: http://lundeenscene.blogspot.com/2008/11/finished-basement.html
